Cable Laying Method - Multiple Cables in Conduit

Similar to Single Cable in Conduit method this is used for power cables.

Parameter 1 is used to define maximum number of cables in conduit, by default it is set to 3.

Parameter 2 and Parameter 3 are used to define voltage levels for conduits that the Multiple Cables in Conduits laying method will be applied to.

If the conduit voltage is MV or LV, and the Multiple Cables in Conduit method is selected, up to three cables of the same voltage level can be auto routed through this conduit.

The Maximum conduit fill factor is applied in the Raceway Router (Max Capacity value).